The offering

The equipment is already in the yard.

Request a rateRequest a rate

Specialized cargo breaks normal forwarding because the inland leg needs equipment that is rarely available on demand: flat racks, permitted overweight configurations, gensets, live-bottom trailers, multi-axle chassis. Sourcing it after the booking adds a margin and a day at every step.

Amar holds that equipment. Quotations that would otherwise wait on subcontractor inquiries are completed internally, because the equipment, the permits and the team dispatching them sit in the same organisation as the person who took your call.

Out-of-gauge & breakbulk

Flat rack and open top booking, with route engineering for the inland move rather than a rate that ignores it.

Overweight corridors

Permitted triaxle and four-axle configurations on approved routes, matched to the load before the rate is confirmed.

Cold chain

Genset fleet with temperature monitoring every four to six hours, vessel to door, under one custodian.

Dangerous goods

TDG and IMDG certified for surface movements, with documentation and handling on the same file as the rest of the shipment.

Project & heavy-lift cargo

Plant relocations, industrial equipment and heavy-lift movements planned end to end, with inland routing engineered alongside the ocean leg.

RORO & LOLO

Roll-on/roll-off and lift-on/lift-off handling for wheeled and craneable cargo that will not travel in a box.

Tank container logistics

Liquid cargo in tank containers, with equipment, cleaning and documentation coordinated as one movement.

Quoted internally, not brokered out.

Out-of-gauge freight is often quoted by relaying a subcontractor’s number, which adds time to the quote and leaves it conditional on that subcontractor’s availability when you accept.

Amar quotes from its own fleet on the same one-business-day standard as every other service. If the equipment is committed, we tell you at quote stage rather than at booking stage.


From dimensions to delivery.

How it works
1

Send the dimensions

Length, width, height, gross weight and any lifting constraints. Feasibility confirmed against our own equipment list.

2

Engineer the route

Corridor, permits and restrictions checked before the rate is confirmed, not discovered after the booking.

3

Book & clear

Ocean or surface booking with documentation and customs entry handled on the same file by our own desk.

4

Deliver

On permitted, owned equipment, with the dispatch team and the equipment in the same organisation.

Specialized cargo FAQ

Questions

Move your next shipment with one accountable partner.

Request a rate Request a rate
How much lead time do you need for an overweight or out-of-gauge move?

Permits and routing drive the lead time rather than equipment availability, since the equipment is ours. Send the dimensions and we’ll tell you what the corridor requires at quote stage.

Do you handle dangerous goods?

Yes. Amar holds TDG and IMDG certification for surface movements and IATA DG certification for air, so dangerous goods stay on the same file as the rest of the shipment.

Can you quote out-of-gauge without a subcontractor?

Yes. Flat racks, multi-axle chassis and permitted configurations are in our own fleet, which is why an out-of-gauge quote runs to the same one-business-day standard as a standard FCL quotation.

Do you move project cargo?

Yes. Project and heavy-lift cargo, industrial equipment and plant relocations are planned as a single movement, with the specialized equipment and permitting handled internally. Send the scope and we will engineer the routing before quoting.

Move your next shipment with one accountable partner.

Send us a lane, a commodity and a volume. A pricing analyst responds within one business day with pricing broken out by leg — ocean, customs, rail, drayage and storage — so you can see what each stage costs.